Manchester Goods Yard, as part of the St John’s Development in Manchester city centre. Will provide a total of 31,000m2 of commercial space, across three interlinked building blocks. This ultra-modern, flexible workspaces will be supplemented by a variety of mixed-use facilities.
A two-storey steel frame would sit on top of a reinforced concrete frame, this would allow for a truly flexible work space on the upper-levels. We were chosen to deliver the structural package for this steel frame.
This project was delivered successfully and to budget during the COVID-19 pandemic, which exerted unique strain on the project. We were able to demonstrate our dedication to health and safety and sound working practices.
Due to the technical requirements of this project, it required all contractors to work collaboratively, to achieve the best outcome for our client. Our ability to work in a collaborative engineering group was commnded by our client throughout this project.
Elland Steel
Structures Ltd
Philmar House, Gibbet
Street, Highroad Well, Halifax, HX2 0AR
© Elland Steel Structures Ltd 2021 | Company Reg No. 1627352